Monday, February 16, 2015

Master Bath Remodel, Phase 1

 We've been saving up to redo our master bath and started the project by fixing a recurring plumbing issue.  Our toilet and bathtub kept backing up.  After multiple plumbing visits we finally had them send the camera down and an obvious problem was found.
 3 foot of pipe was in desperate need of repair!
 Here's the pipe they took out with a lovely crack down the entire 3 feet.  The inside of the pipe was also disgusting as it was only 1/3 of the way clear. Everything else was filled with sludge and roots.
Finished product by the plumbers.  Now we get to fix the rest!