Monday, February 16, 2015
Master Bath Remodel, Phase 1
We've been saving up to redo our master bath and started the project by fixing a recurring plumbing issue. Our toilet and bathtub kept backing up. After multiple plumbing visits we finally had them send the camera down and an obvious problem was found.
3 foot of pipe was in desperate need of repair!
Here's the pipe they took out with a lovely crack down the entire 3 feet. The inside of the pipe was also disgusting as it was only 1/3 of the way clear. Everything else was filled with sludge and roots.
Finished product by the plumbers. Now we get to fix the rest!